I think it's gonna be tough getting everyone done in one day! Especially considering we'll be doing it in the driveway and without a lift! I might just hang out and save the mods for my buddy's shop/lift. I have a feeling my stuff will be the most time consuming!?
The gear oil shipped Friday and will be here tomorrow.
Edit: Just got an email that the tcase fluids shipped. No UPS tracking info yet tho, will update once I can confirm they will be here but it's looking good right now.
I think someone should swing by Harbor Freight and grab some metric impact sockets. TK has standard impact sockets.
JD- Most of the guys need diff/tcase fluids done. Put a truck up onto 4 ramps and change them all at once. Since it'll be pretty level that way. I'm thinking it should take 30-45 mins per truck like that.
I think someone should swing by Harbor Freight and grab some metric impact sockets. TK has standard impact sockets.
JD- Most of the guys need diff/tcase fluids done. Put a truck up onto 4 ramps and change them all at once. Since it'll be pretty level that way. I'm thinking it should take 30-45 mins per truck like that.
Got you covered there. I have metric impact sockets and will be bringing them as well as a spring compressor. Bringing some tools too. Any other special tools/equipment that is needed?